Sizing and Installation

Can You Put an Awning Over an Electric Meter?

Quick answer

A fixed patio cover over an electric meter needs your utility's approval first. A retractable awning mounted above the meter's clear space is not named in any manual checked. Three of the four utility manuals read say a meter should not sit on a covered patio, porch or carport, or in any area likely to be enclosed, and three want a clear space in front of it. Marshfield Utilities sets that box at 36 in deep, 6 ft 6 in high and 24 in past each side of the meter, plus a 30 in path kept clear to 6 ft 6 in. SMUD allows a meter on a covered patio only with prior written approval. Tucson Electric Power lets an existing overhead meter stay under a patio unless the area is enclosed, and Pacific Power makes you clear or move a meter, at your expense, once a deck, fence or enclosure blocks it. So keep posts, outlets and side walls out of the box and the path, keep every part of the awning above 6 ft 6 in there, and never screen in the meter.

Most electric utilities do not want a meter on a covered patio, porch or carport, or anywhere likely to be enclosed later. They also want an empty box of space in front of it. At Marshfield Utilities in Wisconsin, that box is 36 in deep, 6 ft 6 in high and 24 in past each side of the meter. So before a fixed patio cover goes over the meter, get your utility's approval in writing. If the space under it is ever closed in, expect the meter to move, and at Pacific Power the cost is yours.

A retractable awning is a smaller problem. It has no posts and no walls, and it rolls back to the house. Mounted high enough, it never enters the box at all. None of the four manuals checked names awnings.

The meter, the box and the "covered patio"

Three terms decide the answer, so here they are in plain words.

The electric meter is the round or square device that counts the power your house uses. It plugs into a metal box on the outside wall called the meter socket or meter base. This is where the utility's wires meet yours, and it is where a utility worker reads, tests or shuts off your power.

The working space is the empty block of air in front of the meter where that worker stands. Nothing may sit in it: no post, no shelf, no outlet, no plant. Pacific Power ties its working space to NEC 110.26(A), the electrical code section on space around equipment.

A covered patio or an area likely to be enclosed is the utility's worry about the future. Once the meter is inside a room, nobody can reach it from outside. The rules treat a roofed space as one that may be closed in later. That is why they name patios, porches, carports and breezeways (a roofed walkway between two buildings) together.

What four utility manuals say

There is no national rule. Each utility writes its own service manual. Four of them, read in November 2026:

Electric utility rules on meters under covers, enclosure and clear space
Utility and documentCovered patios, porches and carportsEnclosure and accessClear space at the meter
Marshfield Utilities (Wisconsin), Electric Service Manual Section 4Meters shall not "be installed in patio, porch, deck, carport area, or areas likely to be enclosed"Changes to the premises "shall not result in making an existing metering location unsafe or inaccessible"; meters shall not be "enclosed or hidden from sight"36 in deep at 208 or 240 V (42 in at 480 V), 6 ft 6 in high, 24 in each side; 4 in around the socket; 30 in path clear to 6 ft 6 in
SMUD (Sacramento), Engineering Specification T002, Residential Overhead Installations (rev. 4, 1/22)Carports, breezeways, "covered or screened porches and patios" and areas "that might be enclosed at some future date" should not be selected; only "with prior written approval" of SMUD's Engineering DesignerLocked rooms, cabinets or fenced enclosures only after approval, keyed for a SMUD keyLevel standing space 36 in by 30 in; nothing within 8 in to the side or 9 in above the center of the socket
Tucson Electric Power, SR-304 (rev. 3, 4-23)New meters not under "a carport, breezeway, patio, porch, or area that can be enclosed with building expansion"; existing overhead services may stay "unless the area is to be enclosed"All services "must be relocated" if enclosed in "any room, garage, screened in area"; no passage through locked gates or fencesAccessible for reading, testing and maintenance
Pacific Power, Electric Service Requirements Section 4 (2016, 4th edition)Not named; no meter "in an area where metering equipment is likely to be fenced in""Gated outdoor areas and enclosed spaces are not considered accessible"; a meter blocked by "a deck, fence, or enclosure" is cleared or moved "at their expense"Level working space per NEC 110.26(A); nothing in it, "including the space below the meter"

Three of the four name covered patios, porches or carports outright. The fourth, Pacific Power, gets to the same place through access: once a space is enclosed, the meter in it counts as out of reach.

Find your own rule: search your electric utility's name with "electric service requirements" or "service manual," and look for the chapter on meter location or clearances. The figures above apply only in each utility's own territory.

Why you read both "never" and "it's fine"

Two readings of these rules circulate. One says a meter can never go under a patio roof. The other says the code only cares about the working space, so anything above 6 ft 6 in is fine. Both are reading a real rule. They are reading different ones.

The "never" rules are written for choosing where a new meter goes. Marshfield's list starts "Meters shall not: Be installed in." SMUD's says these areas "should not be selected as a meter location." TEP's applies to "new meters." None of them says what happens when you build a cover over a meter that is already there.

For an existing meter, the rules that bite are access and enclosure. TEP lets an existing overhead meter stay under a patio "unless the area is to be enclosed." Marshfield says changes to your property must not make the meter "unsafe or inaccessible," and if they do, you make the fix. If you do not fix it in a reasonable time after a notice, Marshfield "will terminate service." Pacific Power puts the cost on you in plain words.

So the working space side is right about the box, and the "never" side is right about the risk. A patio cover over the meter is where enclosure starts, and the utility gets the final say.

Retractable awning or fixed patio cover

A retractable awning is fabric on a roller held out by folding arms. It mounts to the wall, has no posts, and rolls back against the house when you are done. Nothing about it encloses the space. None of the four manuals mentions awnings, so none forbids one by name. What still applies is the box: no part of the awning may hang into it, and nothing that comes with it may stand in it.

A fixed patio cover is a permanent roof of aluminum, wood or polycarbonate on posts. It is the "covered patio" these rules describe. It is also the kind of space TEP means by an area "that can be enclosed with building expansion." If yours will sit over the meter, call the utility before you order. In SMUD territory, ask for the written approval its spec requires. The awning vs patio cover guide covers the other differences. A fixed awning with front posts raises the same post and path questions as a patio cover.

Side screens, privacy curtains and walls change the answer for either type. TEP relocates a meter in any "screened in area." Marshfield bars a meter that is "enclosed or hidden from sight." If you plan to close in the sides of the patio later, plan for the meter move now.

The box in front of the meter, from above

Marshfield's figures are the most complete of the four, so they make a good layout to plan around. The box runs 36 in out from the wall for a normal 120/240 V house service. It spans the width of the meter equipment plus 24 in on each side. It is 6 ft 6 in high, or as high as the equipment if that is taller. There must also be 4 in clear on all sides of the socket itself.

The path matters as much as the box. Marshfield wants "a 30" wide path to the meter" kept clear to 6 ft 6 in. A cover post in the middle of the patio can block the path even when the box is clear.

Plan view from above of a house wall with a meter, a shaded box 36 inches deep and 24 inches past each side, a 30 inch path leading out from it, and a 10 foot awning or cover outline above with one post standing in the path
Drawn to scale from above, using Marshfield Utilities' figures. The shaded box is 36 in deep and 24 in past each side of the meter, and stays empty up to 6 ft 6 in. The 30 in path out to the yard stays clear to the same height. The dashed outline is a 10 ft deep awning or cover above. Its fabric may pass over the box if it stays higher than 6 ft 6 in. The middle post of a fixed cover lands in the path and fails.

SMUD draws the box a little differently. It wants a level standing space 36 in long and 30 in wide in front of the meter. Nothing may sit within 8 in to the side or 9 in above the center of the socket. That 9 in rule is the one an awning bracket could break, so keep brackets well above and beside the meter.

Worked example: one wall, two plans

Here is how the rules play out on a typical wall. Nothing here was installed or measured. It is the published figures, worked through.

Worked example

Take a back wall in Marshfield's territory. The meter sits 5 ft above the patio, in the middle of a 16 ft stretch the owner wants to shade. The service is 120/240 V, so the box is 36 in deep and 6 ft 6 in (78 in) high.

Plan A: a 10 ft retractable awning. Suppose the brackets go at 9 ft 6 in (114 in) with a 14 degree pitch, which drops about 3 in per foot. At 3 ft out, the front edge of the box, the fabric is at 114 - 9 = 105 in. That is 27 in above the box. At the front bar, 10 ft out, it is at 114 - 30 = 84 in, or 7 ft. That clears the 78 in path by 6 in, even with the awning open.

Now suppose the brackets go at 8 ft 6 in (102 in) instead. The front bar drops to 102 - 30 = 72 in, or 6 ft. Retracted, nothing changes. Open, the bar hangs 6 in into the path's 78 in height wherever the path runs under it. Raise the brackets, or route the path out past the end of the awning.

Plan B: a 10 by 16 ft aluminum patio cover with posts at both front corners and one in the middle. The middle post lands 10 ft straight out from the meter, in the path. Move it, or choose a layout with every post clear of the path. Then the bigger issue remains: the meter is now on a covered patio. That is the location Marshfield's rule names. Ask the utility before you build.

For how bracket height, pitch and headroom trade off on your own wall, see the awning mounting height guide and the projection and pitch guide.

Which plan needs what

What each kind of cover over the meter needs, by the rules above
Your planWhat the rules sayWhat to do
Retractable awning, no posts or sides, every part above 6 ft 6 in over the box and pathNot named in any manual checked; Marshfield's box and path stay clearKeep the box and path empty; ask the utility if you are unsure
Retractable awning whose open front bar hangs below 6 ft 6 in over the pathMarshfield: path clear to 6 ft 6 inRaise the brackets or route the path past the awning's end
Fixed patio cover over the meter, sides openCovered patio: SMUD needs prior written approval; TEP lets an existing overhead meter stay unless enclosedAsk the utility before you order, in writing
Any cover with screens, walls or a fence closing in the meterTEP: relocate; Marshfield: not enclosed or hidden; Pacific Power: inaccessiblePlan to move the meter; Pacific Power puts the cost on you
Post, footing, outlet or switch in the box or below the meterMarshfield: box clear; Pacific Power: nothing in the working space, "including the space below the meter"Move it out of the box

Outlets, switches and the gas meter next door

A motorized awning brings an outlet, a wall switch and a cord. Pacific Power says plainly that "devices mounted below the meter are not acceptable." Put the outlet and switch beside the box, not under the meter or inside the 24 in on either side. The guide to how much power a motorized awning uses covers what kind of outlet the motor needs.

Gas meters often share the wall. Marshfield keeps the electric meter socket at least 36 in "from any part of the gas meter or gas service," and Pacific Power keeps it 36 in sideways from gas meters, valves and regulators. The gas side has its own rules for awnings over it, set out in can you put an awning over a gas meter. Above the meter, the wire from the pole has clearance rules of its own too, in how close an awning can be to the power line to your house.

When the utility wants a cover

Snow country turns the question around. Marshfield wants meters "protected from damage by falling ice, snow, or other objects." Where a building overhang does not shield the meter from falling ice and snow, "particularly from metal roofs," the customer must fit a steel shield of at least 10 gauge. Wood or plywood shields are not allowed, and the customer pays for ice and snow damage. A fabric awning is not that shield, and a retractable one is rolled up all winter. If ice falling on the meter is the worry, fit the utility's shield. What snow does to the awning itself is covered in awnings and snow.

Before you order

  1. Mark the box. Tape out 36 in from the wall and 24 in past each side of the meter on the patio. Mark the path the meter reader would walk.
  2. Check the heights. Work out where the lowest part of the awning sits over the box and the path. Every point must be above 6 ft 6 in.
  3. Place the posts and power. Keep posts, footings, outlets and switches out of the box and the path, and nothing below the meter.
  4. Call the utility for a fixed cover. Send a photo and a sketch with the measurements, and keep the reply. The same sketch helps with permits and HOA review.

Where this answer stops applying

These are four utilities, and yours may differ. Each writes its own manual, the working space grows to 42 in at 480 V, and a commercial meter bank has its own drawings. The rules for where a new meter goes are not the rules for building near an old one. Only TEP and Marshfield speak to existing meters directly. No manual says whether a retractable awning counts as a covered patio. That is the utility's call, not this page's, so ask if the awning will sit over the meter. Your city's building code and the electrical inspector may add their own rules for a patio cover. And none of this lets you move or open the meter yourself. SMUD, for one, lets only its own employees connect its wiring to yours.

Key takeaways

  • Three of four utility manuals checked bar meters on covered patios, porches and carports, and in areas likely to be enclosed.
  • Keep a box clear in front of the meter: 36 in deep, 6 ft 6 in high and 24 in past each side at Marshfield, plus a 30 in path.
  • A retractable awning above 6 ft 6 in with no posts or sides is not named in any manual checked.
  • A fixed patio cover over the meter needs the utility's approval first; SMUD wants it in writing.
  • Screens or walls around the meter mean moving it. Pacific Power makes the customer pay.

Frequently asked questions

Can I build a patio cover over my electric meter?

Only after asking your electric utility. Marshfield, SMUD and TEP all name covered patios as places a meter should not go. SMUD allows it only with prior written approval, and TEP lets an existing overhead meter stay unless the patio is enclosed.

How much clear space does an electric meter need?

At Marshfield Utilities, 36 in in front for a 120/240 V house, 6 ft 6 in high and 24 in past each side, plus a 30 in path. SMUD asks for a level standing space 36 in by 30 in. Pacific Power ties its working space to NEC 110.26(A).

Who pays to move a meter that a deck or cover blocks?

The customer, at Pacific Power: a meter made inaccessible by a deck, fence or enclosure is cleared or moved "at their expense." Marshfield also requires the customer to fix it and can cut service if they do not.

Can I screen in a patio that has the meter on it?

Plan on moving the meter. TEP relocates any service enclosed in a "screened in area," Marshfield bars meters that are enclosed or hidden, and Pacific Power treats enclosed spaces as inaccessible.

Sources and further reading

How we write our guides: figures are typical US ranges checked against manufacturer documentation, published standards and installer pricing. Read our editorial standards. Spotted an error or outdated detail? Request a correction.